Coliban Water

  • Call for improved access to water

    Call for improved access to water

    A group of Mount Alexander Shire locals is petitioning Coliban Water to improve water access from public standpipe taps. Petition organiser Rosemary Sorensen said the shire was well behind other shires in the region when it came to this basic service. “We want Coliban and the council to plan now to make the necessary changes,…

  • ‘Do not drink Harcourt water’ advisory

    ‘Do not drink Harcourt water’ advisory

    Coliban Water, following consultation with the Department of Health, has advised customers in Harcourt to not drink tap water from 11.45am on Saturday, January 10, until further notice.  This advice has been issued following the fires in Harcourt on Friday, January 9, which impacted Coliban Water’s ability to safely access a burst water main that may…

  • Roo savaged by dog, left to drown

    Roo savaged by dog, left to drown

    A kangaroo was saved from the Coliban Main Water Channel by wildlife rescuers after it was attacked by an off-leash dog in Elphinstone on March 28. Volunteers from Wildlife Victoria were called to the scene and managed to extract the 70kg male kangaroo from the water channel, before providing medical assistance. He was taken to…

  • Glimpse at plant’s future

    Glimpse at plant’s future

    The Castlemaine community had an opportunity to have its say on plans to upgrade the Castlemaine Water Reclamation Plant at two public drop-in sessions this month. Feedback from the public acknowledged the need to upgrade the plant to meet the area’s growing population, while ensuring improved wastewater treatment that will continue to benefit Campbells Creek’s…

  • River restoration a win-win

    River restoration a win-win

    A community-backed plan to restore and protect a key section of the Coliban River at Lauriston will take its next steps early in the new year. Over the next four years, the A Healthy Coliban Catchment project will focus on rehabilitating the river’s frontage between Lauriston and Malmsbury reservoirs. Willow removal and revegetation works on…

  • Collaborating on fire risk

    Collaborating on fire risk

    A range of emergency services have toured Coliban Water’s three main reservoirs as part of fire season preparedness. Representatives from the CFA, police, Macedon Ranges Shire Council and Fire Rescue Victoria participated in the tour earlier this month. Coliban Water’s general manager of asset lifecycle, Marsha McMonigle, said it was important to engage with colleagues…

  • Planning begins for plant upgrade

    Planning begins for plant upgrade

    The conversation around plans for a vital upgrade of the Castlemaine Water Reclamation Plant began with two information drop-in sessions in Castlemaine last week. Environmental flows and water quality in Campbells Creek were key discussion points at the sessions hosted by Coliban Water. Planned upgrades to the plant will be carried out in stages, including…

  • Holistic grazing workshop open

    Holistic grazing workshop open

    Local landowners have the opportunity to sign up for a short course in holistic grazing management. The course will assist landowners to improve their skills and knowledge about grazing livestock. It will also include discussions and six visits to various farms, a visit to each participant’s property to develop a plan, and online tutorials. Holistic…

  • LICENCE EASED FOR COLIBAN

    LICENCE EASED FOR COLIBAN

    Coliban Water has won concessions on its operating licence for the Kyneton Water Reclamation Plant after challenging Environment Protection Authority requirements at the Victorian Civil and Administrative Tribunal. A December 2023 EPA approval to amend the licence for the operation of the plant set a ratio of less than one part effluent released from the…

  • Coliban to appeal licence

    Coliban to appeal licence

    Coliban Water will appeal its new Kyneton Water Reclamation Plant operating licence from the EPA at the Victorian Civil and Administrative Tribunal.

  • Malmsbury Reservoir bridge under repair

    Malmsbury Reservoir bridge under repair

    Malmsbury Reservoir’s picturesque access bridge is undergoing a major refurbishment of the heritage-listed structure.

  • Irrigation pipeline completed

    Irrigation pipeline completed

    Angela CrawfordWork on an irrigation pipeline designed to divert treated wastewater from the Kyneton Water Reclamation Plant to irrigators is now complete. Known as the Kyneton Recycled Water Irrigation project, the 14-kilometre pipeline network will pump up to 300 megalitres of recycled water to farmland to reduce the risk of the plant discharging excess wastewater…